Friday
December 16, 2005
|
We completed the preparations so the RV washroom laundry is ready to pour concrete. We also set up the 6-gang meter base with conduits ready to pour. My last day until after the New Year. Heading back to Canada for Christmas with the family. Bruce will work the Mexicans and pour the concrete foundation and slab for the RV washroom as well as make the adobes and complete the second Volunteer Apartment. |
Friday
December 16, 2005
|
We completed the preparations so the RV washroom laundry is ready to pour concrete. We also set up the 6-gang meter base with conduits ready to pour. My last day until after the New Year. Heading back to Canada for Christmas with the family. Bruce will work the Mexicans and pour the concrete foundation and slab for the RV washroom as well as make the adobes and complete the second Volunteer Apartment. |
Thursday
December 15, 2005 |
Zack built the second RV cairn. Stanley completed the underground plumbing for the RV washroom/laundry. |
Wednesday
December 14, 2005 |
Zack built the first RV service cairn and it looks great! Each cairn will have services for two RV’s. Also set blocks into the foundation of RV washroom. |
Tuesday
December 13, 2005 |
Went thru the plumbing changes with Stanley. A toilet and two showers have to be moved so that work with the walls. The adobe walls are going up. |
Monday
December 12, 2005 |
Bruce down for the count. I missed half the day feeling weak. Stanley the plumber arrived from Tucson and brought us a 1-1/2” fire hose so we can water the adobe mix faster. |
Sunday
December 11, 2005 |
The flu bug wins the day. Both Bruce and I are under the weather so we did nothing on the job site today. |
Sabbath
Decmber 10, 2005 |
Took Bill to the airport and took the long way back, along the back roads of Mexico. Check out the slide show Along Mexico’s Back Roads.” |
Friday
December 9, 2005 |
Electrical got completed in row four yesterday and rows five and six get completed in VA two. Bill gave us all a practical course on operating the adobe maker and how the electrical system works. |
Thursday
December 8, 2005 |
Eureka, It Works! The block maker now works on automatic. Thank you, Bill! We also finished the RV drain tile fields and sent the hired back hoe operator home.
|
 |