There are a lot more pictures than you think. Click on any of the titles above to see different sub-albums and be sure to use the slide show arrow controls (above left) to move through separate pages of the photo album. The slide show will display much larger versions of these photos if you click on the center slide show button.
An 8-Inch storm drainage pipe leaves the buiding under the bell tower footing. Note the heavy rebar.
The ready-mix company just got a new pumper truck that can reach 90 feet.
Courtyard storm drainage with risers where the columns for arches will be.
Stanley placing the short castillos in the wet concrete over the down spouts.